Appendix 1: Self-Test Answer Keys
Competency E1
Self-Test 1
- C
- B
- C
- A
- A
Self-Test 2
- B
- C
- A
- B
- D
- D
Self-Test 3
- B
- B
- B
- C
- D
- B
- A
- A
- B
Competency E2
Self-Test 1
- D
- B
- B
- B
- B
- D
- B
- C
- A
- B
- B
- B
- B
- A
- C
Competency E3
Self-Test 1
- A
- B
- B
- A
- D
- D
- B
- C, D, A, B
- B
- A
- A
- A
- A
Self-Test 2
-
Type of Gas Natural Gas Piping Material Steel System Pressure 1.75 kPa Table Used A.2 (b) Metric Table Allowable Pressure Drop 250 Pa Longest Measured Run (LMR) 12 m Code Zone (CZ) 12 m Pipe Letter Pipe Load Pipe Size A 35 kW [latex]\frac{3}{4}[/latex] in B 10 kW [latex]\frac{1}{2}[/latex] in C 45 kW [latex]\frac{3}{4}[/latex] in -
Type of Gas Propane Gas Piping Material Copper Tube System Pressure 11 in Table Used B.6 (a) Imperial Table Allowable Pressure Drop 1 in Longest Measured Run (LMR) 35 ft Code Zone (CZ) 40 ft Pipe Letter Pipe Load Pipe Size A 100 MBH [latex]\frac{5}{8}[/latex] in B 40 MBH [latex]\frac{1}{2}[/latex] in C 140 MBH [latex]\frac{3}{4}[/latex] in -
Type of Gas Natural Gas – Low Pressure Systems Natural Gas – High Pressure Systems Piping Material Copper Tube Copper Tube System Pressure 7 in 2 psig Table Used A.9 (a) Imperial A.10 (a) Imperial Table Allowable Pressure Drop 1 in 1 psig Longest Measured Run (LMR) A = 10 ft B = 20 ft
C = 40 ft
40 ft Code Zone (CZ) A = 10 ft B = 20 ft
C = 40 ft
40 ft Pipe Letter Pipe Load Pipe Size A 100 MBH [latex]\frac{5}{8}[/latex] in OD copper tube B 40 MBH [latex]\frac{1}{2}[/latex] in OD copper tube C 40 MBH [latex]\frac{5}{8}[/latex] in OD copper tube D 180 MBH [latex]\frac{1}{2}[/latex] in OD copper tube
Self-Test 3
-
Type of Gas Natural Gas Piping Material Welded carbon with forged fittings System Pressure 5 psig Table Used A.5 (a) Imperial Table Allowable Pressure Drop 2.5 psig Longest Measured Run (LMR) 160 ft Code Zone (CZ) 200 ft Proofed longest (ELR) 187.17 ft Pipe Letter Pipe Load Pipe Size A 1,500 MBH 1 in B 3,000 MBH [latex]1 \frac{1}{4}[/latex] in C 4,500 MBH [latex]1\frac{1}{2}[/latex] in Proof of C-A
[latex]\begin{array}{ll}\text{4 - 1½″ welded 90° @ 1.61 feet}&=6.44 \text{ feet} \\ \text{2 - 1½″ welded tee @ 6.04 feet}& = 12.08 \text{ feet} \\ \text{2 - 1″ welded 90° @ 2.06 feet}&=2.10 \text{ feet} \\ \text{1 - 1″ valve @ 2.62 feet}& = 2.62\text{ feet} \\ \text{1 - 1″ welded tee @ 3.93 feet}& = \underline{3.93 \text{ feet}} \\ \text{Equivalent Fitting Length} & = 27.17\text{ feet} \\ \text{Measured Length C-A} & = \underline{160.00 \text{ feet}} \\ \text{Longest Equivalent Length of Run (ELR)} &= 187.17\text{ feet} \end{array}[/latex]The longest ELR is 187.17 feet, so the 200 ft code zone was correct.
-
Type of Gas Natural Gas Piping Material Welded carbon with forged fittings System Pressure 34 kPa Table Used A.5 (b) Metric Table Allowable Pressure Drop 17 kPa Longest Measured Run (LMR) 30 m Code Zone (CZ) 45 m Proofed Longest (ELR) 41.03 m Pipe Letter Pipe Load Pipe Size A 293 kW [latex]\frac{3}{4}[/latex] in B 805 kW [latex]1\frac{1}{4}[/latex] in C 3,000 kW 2 in D 1,170 kW [latex]1\frac{1}{4}[/latex] in E 4,170 kW 2 in F 4,975 kW [latex]2\frac{1}{2}[/latex] in G 5,268 kW [latex]2\frac{1}{2}[/latex] in Proof of G – B
[latex]\begin{array}{ll}\text{2 - 2½″ welded 90° @ 0.75m}&=1.50 \text{ m} \\ \text{2 - 1½″ welded tees @ 2.82 m}& = 5.64\text{ m} \\ \text{3 - 1¼″ welded 90° @ 0.42 m}&=1.26 \text{ m} \\ \text{1 - 1¼″ valve @ 1.05 m}& = 1.05\text{ m} \\ \text{1 - 1¼″ welded tee @ 1.58 m}& = \underline{1.58 \text{ m}} \\ \text{Equivalent Fitting Length} & = 11.03\text{ m} \\ \text{Measured Length C-A} & = \underline{30.00 \text{ m}} \\ \text{Equivalent Length of Run (ELR)} &= 41.03\text{ m} \end{array}[/latex]Additional proofs
Proof of G-C
[latex]\begin{array}{ll}\text{2 - 2½″ welded 90° @ 0.75m}&=1.50 \text{ m} \\ \text{1 - 2½″ welded tees @ 2.82 m}& = 2.82\text{ m} \\ \text{3 - 2″ welded 90° @ 0.63 m}&=1.89\text{ m} \\ \text{1 - 2″ valve @ 1.58 m}& = 1.58\text{ m} \\ \text{2 - 2″ welded tees @ 2.36 m}& = \underline{4.72 \text{ m}} \\ \text{Equivalent Fitting Length} & = 12.51\text{ m} \\ \text{Measured Length C-A} & = \underline{22.00 \text{ m}} \\ \text{Equivalent Length of Run (ELR)} &= 34.51\text{ m} \end{array}[/latex]Proof of G-D
[latex]\begin{array}{ll}\text{2 - 2½″ welded 90° @ 0.75m}&=1.50 \text{ m} \\ \text{1 - 2½″ welded tees @ 2.82 m}& = 2.82\text{ m} \\ \text{3 - 1¼″ welded 90° @ 0.42 m}&=1.26\text{ m} \\ \text{1 - 1¼″ valve @ 1.05 m}& = 1.05\text{ m} \\ \text{1 - 1¼″ welded tee @ 1.58 m}& = \underline{1.58\text{ m}} \\ \text{Equivalent Fitting Length} & = 8.21\text{ m} \\ \text{Measured Length C-A} & = \underline{25.00 \text{ m}} \\ \text{Equivalent Length of Run (ELR)} &= 33.21\text{ m} \end{array}[/latex]The longest ELR is 41.03 metres, so the 45 meter code zone was correct.
- 7″ WC Piping System:
Type of Gas Natural Gas Piping Material Screwed carbon steel pipe System Pressure – 7″ WS 7″ WC Table Used A.2 (a) Imperial Table Allowable Pressure Drop 1″ WC Longest Measured Run (LMR) 93 ft Code Zone (CZ) 100 ft Pipe Letter Pipe Load Pipe Size A 100 MBH [latex]\frac{3}{4}[/latex] in B 75 MBH [latex]\frac{3}{4}[/latex] in C 175 MBH 1 in 2 PSG Piping System:
Type of Gas Natural Gas Piping Material Screwed carbon steel pipe System Pressure – 2 PSI 2 psig Selected Pressure Drop – 1 PSI 1 psig Table Used A.3 (a) Imperial Longest Measured Run (LMR) 83 ft Code Zone (CZ) 90 ft Pipe Letter Pipe Load Pipe Size 1 300 MBH [latex]\frac{1}{2}[/latex] in 2 150 MBH [latex]\frac{1}{2}[/latex] in 3 450 MBH [latex]\frac{3}{4}[/latex] in 5 PSG Piping System
Type of Gas Natural Gas Piping Material Screwed carbon steel pipe System Pressure – 5 PSI 5 psig Table Used A.5 (a) Imperial Table Allowable Pressure Drop 2.5 psig Longest Measured Run (LMR) 84 ft Code Zone (CZ) 125 ft Proofed Longest (ELR) Pipe Letter Pipe Load Pipe Size A 5,000 MBH [latex]1\frac{1}{4}[/latex] in B 450 MBH [latex]\frac{1}{2}[/latex] in C 5,450 MBH [latex]1\frac{1}{4}[/latex] in D 175 MBH [latex]\frac{1}{2}[/latex] in E 5,625 MBH [latex]1\frac{1}{4}[/latex] in Proof of G – B
[latex]\begin{array}{ll}\text{5 - 1¼″ screwed 90° @ 3.45 ft}&=17.25 \text{ ft} \\ \text{1 - 1¼″ valve @ 3.45 ft}& = 3.45 \text{ ft} \\ \text{2 - 1¼″ screwed tees @ 6.90 ft}&=\underline{13.80 \text{ ft}} \\ \text{Equivalent Fitting Length} & = 34.50\text{ feet} \\ \text{Measured Length C-A} & = \underline{84.00 \text{ feet}} \\ \text{Equivalent Length of Run (ELR)} &= 118.50\text{ feet} \end{array}[/latex]The longest ELR is 118.50 feet, so the 125 ft code zone was correct.
Competency E5
Self-Test 1
- A
- D
- A
- C
- B
- B
- B
- C
- D
- B
Self-Test 2
- A
- B
- A
- B
- C
- A
- Match the names of the burner parts to their
lettered locations- Venturi D
- Mixing Tube C
- Burner Ports A
- Orifice E
- Burner Head B
- Primary air openings F
- B
- A
- C
- C
- A
- A
- B
- B
Self-Test 3
- C
- B
- D
- D
- B
- D
- B
- B
- C
- D
- B
- A
- C
- B
- A
Competency E6
Self-Test 1
- D
- C
- D
- B
Self-Test 2
- B
- B
- C
- B
- A
- A
- A
- C
Self-Test 3
- C
- C
- B
- B
- C
- D
- B
- B